Commercial/Industrial Water Fees
Tap Fees
5/8″ & 3/4″: $760.00¹
1″: $930.00¹
1 1/2″ or larger: Cost of Materials, Labor and Equipment to install
(1)In those instances where the cost of the installation exceeds the published tap or set fee due to rock, the property owner will be charged the actual cost of the Materials, Labor, and Equipment to make the tap or set.
System Development Charge
5/8″ & 3/4″ $290.00
1″ $410.00
1 1/2″ $530.00
2″ $850.00
3″ $3,230.00
4″ $4,120.00
6″ $6,170.00